Project Description
This project involved a complete renovation of a primary bathroom, hall bathroom, powder room, and a custom bathroom island. As a design & build project, we guided the homeowners through every step, from initial concepts to final construction.
One of the most significant challenges was incorporating a large soaker tub in the primary bathroom. The plumbing lines needed to be centered along the wall, but existing floor joists made this difficult. We devised an innovative solution to relocate the drain lines while ensuring they remained accessible for future maintenance. This approach not only resolved the structural challenge but also maintained an aesthetically pleasing finish.
Additionally, the renovation required relocating existing plumbing and removing walls to optimize the layout, creating a more functional and visually stunning space for the homeowners.